亚洲日韩在线视频 国产

<ruby id="gvdrc"><bdo id="gvdrc"><ol id="gvdrc"></ol></bdo></ruby>

<em id="gvdrc"><ruby id="gvdrc"></ruby></em>
    <button id="gvdrc"></button>
    <em id="gvdrc"></em>

  1. Steel Strip Surface Cleaning Shot Blasting Machine

    Delivery term:The date of payment from buyers deliver within days
    • Price:

      Negotiable

    • minimum:

    • Total supply:

    • Delivery term:

      The date of payment from buyers deliver within days

    • seat:

      Shandong

    • Validity to:

      Long-term effective

    • Last update:

      2019-12-19 05:10

    • Browse the number:

      322

    Send an inquiries
    Company Profile
    Qingdao Xiangmao Machinery Manufacturing Co., Ltd.
    Contactaixin:

    qdxiangmao(Mr.)  

    Email:

    telephone:

    phone:

    Arrea:

    Shandong

    Address:

    Taihou Industrial Park, Zhuhai Subdistrict Office, Huangdao District, Qingdao, China

    Website:

    http://www.cnshotblast.com/ http://qdxiangmao.szlyqd.com/

    Product details

    Features

    Steel strip shot blasting machine is a special equipment for steel strip continuous production line. Through the shot blasting to remove the surface of the strip of oxide, rust.


    Strip materials and product conditions

    1. Coil status

    Steel strip type: Q235A/B

    Strip thickness: 3.0 ~13.0mm

    Strip width: 1000 ~20 00mm

    Strip temperature: room temperature

    Raw materials: From the hot-rolled coil

    Capacity

    2. Production capacity

    20~100m/min

    3. Common media conditions


    Power Supply System

    ● Power supply: 380VAC,- 10% ~+ 15% ; 50Hz±1Hz

    ● Operate the power supply: 220VAC, 24VDC

    ● Solenoid valve power: DC24V


    Compressed Air

    ● Dry oil-free compressed air, pressure: 0.5~0.6Mpa

    ● Consumption: 15 m3/min


    Workpiece Cleaning Order

    Strip feeding → Shot blasting → High-pressure blower to purge the abrasive →Strip unloading

    Abrasive Recycling Process

    Abrasive Storage → Flow Control → Shot Blasting →Screw conveyor Horizontal Transport → Bucket elevator Lift →Separation → Abrasive Storage


    Dust Treatment Process

    Room dust and separator dust → Butterfly valve air volume control →Inertial dust collector → Bag filter → Fan → Exhaust air.

    The machine with PLC electrical control, pneumatic valve air cylinder control, abrasive controllable gate and abrasive cycle fault detection device to achieve automatic machine control, which has high productivity, reliability and advanced degree of automation and soon.


    After-Sale Service

    1. Installation and commissioning issue: We will send one technician to assist with machine installation and commissioning, customer pays for their tickets, hotel and diet.

    2. Warranty time:12 months from date of commissioning completion, but no more than 18 months from date of delivery.

    3. Supply full english documents: including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.

    http://www.cnshotblast.com/

    ? 亚洲日韩在线视频 国产
    <ruby id="gvdrc"><bdo id="gvdrc"><ol id="gvdrc"></ol></bdo></ruby>

    <em id="gvdrc"><ruby id="gvdrc"></ruby></em>
      <button id="gvdrc"></button>
      <em id="gvdrc"></em>